Connect The Cable To The Outdoor Unit; Pipe Insulation - Panasonic UX09 E5 Serie Manual De Instalación

Unidad exterior de bomba de calor de aire a agua
Ocultar thumbs Ver también para UX09 E5 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 6
If gauge needle does not move from 0 cmHg (0 MPa) to –76 cmHg
(–0.1 MPa), in step 3 above take the following measure:
If the leak stops when the piping connections are tightened
further, continue working from step 3.
If the leak does not stop when the connections are
retightened, repair location of leak.
Do not release refrigerant during piping work for installation
and reinstallation. Take care of the liquid refrigerant, it may
cause frostbite.
CONNECT THE CABLE TO
5
THE OUTDOOR UNIT
(FOR DETAIL REFER TO WIRING DIAGRAM AT UNIT)
1. Remove the control board cover from the unit by loosening the
screw.
2. Connecting cable between indoor unit and outdoor unit shall be
approved polychloroprene sheathed fl exible cable (see below
table), type designation 60245 IEC 57 or heavier cable.
3. Secure the cable onto the control board with the holder (clamper).
4. Attach the control board cover back to the original position with
screw.
WARNING
This equipment must be properly earthed.
Models
UX09*E5*/UX12*E5*/
UD12*E5*/UD16*E5*
Terminals on the indoor unit
Colour of wires
Terminals on the outdoor unit
Models
UX09*E8*, UX12*E8*,
UX16*E8*, UD09*E8*,
UD12*E8*, UD16*E8*
Terminals on the indoor unit
Colour of wires
Terminals on the outdoor unit
For three phase model never operate the unit by pressing the
electromagnetic switch.
Never correct the phase by switching over any of the wires inside
the unit.
CAUTION
Flexible cable specifi cation
4 x min 4.0 mm
2
1
2
3
1
2
3
Earth Wire
must be
longer than
others cables
for safety
reason.
Flexible cable specifi cation
2
6 x min 1.5 mm
1
2
3
4
5
1
2
3
4
5
Earth Wire
must be
longer than
others cables
for safety
reason.
CAUTION
Select required direction and apply protective bushing
provided in accessories to protect cables from sharp edges.
Once all wiring work has been completed, tie the cable and
cord together with the binding strap so that they do not touch
other parts such as the compressor and bare copper pipes.
Outdoor Unit
Protective
bushing 3
Apply cut
DETAIL OF CONNECTING CABLE GUIDING
WIRE STRIPPING AND CONNECTING REQUIREMENT
Wire stripping
Indoor/outdoor
connecting terminal
board
No loose strand when insert
Conductor fully
Conductor over
insert
ACCEPT
PROHIBITED

PIPE INSULATION

6
1. Please carry out insulation at pipe connection portion as mentioned
in Indoor/Outdoor Unit Installation Diagram. Please wrap the
insulated piping end to prevent water from going inside the piping.
2. If drain hose or connecting piping is in the room (where dew may
form), please increase the insulation by using POLY-E FOAM with
thickness 6 mm or above.
Indoor/outdoor unit
terminal board
Cord clamp
Banding strap
(Field Supply)
Connecting cable
(refer below
diagram for its
guiding)
Selection
of direction
5 mm or more
(gap between wires)
Conductor not
fully insert
insert
PROHIBITED
5

Publicidad

Tabla de contenido
loading

Tabla de contenido