Rational UltraVent XS 6 2/3 E Instrucciones De Instalación página 27

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51
Installation instruction
Electrical connection of the UV
Installation of the bus cable:
High voltage
Observe local regulations and standards during
installation!
> At the rear side of the UV the connection box
with the control pcb is located.
> A bus cable is already connected to the PCB. This
bus cable is carrying a second cable gland for
connection to the unit.
> Remove the left side panel of the unit.
Danger!
GB
27

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

60.73.865

Tabla de contenido