Installation; Preliminary Checks - entrematic Ditec PWR50H Manual Tecnico

Ocultar thumbs Ver también para Ditec PWR50H:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 76

6. Installation

The declared operating and performance features can only be guaranteed with the use of EN-
TREMATIC accessories and safety devices.
Unless otherwise specified, all measurements are expressed in mm.

6.1 Preliminary checks

Make sure the gate structure is sturdy and the hinges are lubricated and smooth.
If possible, fit an opening and closing stop. Otherwise, use the built-in mechanical stops and/or
the electric limit switches (optional) if available.
comply with the requisites of Standard EN12604.
The automation fastening point varies according to the space available and the gate to be
i
automated. The installer must therefore choose the best solution to ensure that the system
works correctly in each individual situation.
The installation measurements indicated in the table allow you to choose the values of [A] and [B] on
the basis of the required opening angle and in relation to the on-site spaces and overall dimensions.
Increasing measurement [A], you reduce the opening approach speed.
Reducing measurement [B], you increase the gate opening angle.
Measurements [A] and [B] must, however, be compatible with the effective piston stroke.
Tab. 6.1
A
B
200
190
200
200
100
220
130
210
170
220
200
190
150
220
130
290
D
C
S
20
170
50
150
50
170
70
140
100
120
100
90
150
70
220
70
The mechanical construction elements must
A
P
min 60 con apertura a 90°
min 60 with 90° opening
D
E
120°
110°
90°
95°
120
95°
100°
95°
90°
29
L
P min
220
220
120
150
910
190
220
170
150

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ditec pwr50hvDitec pwr50hr

Tabla de contenido