Safety
Notes
Gloves should be worn during installation to prevent
crushing and cutting injuries.
The product may only be used for bathing, hygienic
and body cleaning purposes.
The hot and cold supplies must be of equal pres-
sures.
Installation
Instructions
• Prior to installation, inspect the product for transport
damages. After it has been installed, no transport or
surface damage will be honoured.
• The pipes and the fixture must be installed, flushed
and tested as per the applicable standards.
• The plumbing codes applicable in the respective
countries must be observed.
Technical
Data
Operating pressure:
Recommended operating pressure:
Test pressure:
Hot water temperature:
Recommended hot water temp.:
The product is exclusively designed for drinking water!
4
max. 1 MPa
0,1 - 0,5 MPa
1,6 MPa
(1 MPa = 10 bar = 147 PSI)
max. 70°C
65°C
Assembly
(see page 31)
English
Symbol
description
Do not use silicone containing acetic acid!
A
basin
mixer
B
Pillar
Tap
Adjustment
(see page 34)
After the installation, the output temperature
of the fitting must be tested and set to the
temperate desired by the customer.
Thermal
disinfection
70°C
(see page 40)
Thermal disinfection pursuant to process
sheet DVGW W 551 (≥ 70°C / > 3 min)
must only be carried out by qualified person-
nel.
Maintenance
(see page 36)
• The check valves must be checked
• To guarantee the smooth running of the
Dimensions
(see page 41)
Spare
parts
(see page 41)
Cleaning
(see page 35)
regularly according to DIN EN 1717 in
accordance with national or regional
regulations (at least once a year).
thermostat, it is necessary from time to
time to turn the thermostat from total hot
to total cold.