DIMENSIONS
Figure 6
Figure 8
VISOR INSTALLATION INSTRUCTIONS
1.
Remove power from floodlight.
2.
Place floodlight face up.
3.
Carefully align visor with four (4) screw holes at the top of the fixture
shown in Figure 8.
4.
Install screws provided with visor, taking care to not scratch the finish of
the floodlight. Torque to 19 in.-lbs. (2.2 N-m).
5.
Install floodlight per above instructions.
NOTE: Visor can be installed before or after floodlight has been in operation.
All statements, technical information and recommendations contained herein are based on information and tests we believe to be reliable. The accuracy
or completeness thereof are not guaranteed. In accordance with Crouse-Hinds "Terms and Conditions of Sale," and since conditions of use are outside
our control, the purchaser should determine the suitability of the product for his intended use and assumes all risk and liability whatsoever in connection
therewith.
With Visor and Guard
With Visor Only
Eaton's Crouse-Hinds Division
1201 Wolf Street, Syracuse, New York 13208 • U.S.A.
Copyright
©
Figure 5
GUARD INSTALLATION INSTRUCTIONS
1.
Remove power from floodlight.
2.
Place floodlight face up.
3.
Carefully align guard with four (4) screw holes on each side of the fixture shown
in the image above.
4.
Install screws provided with guard, taking care to not scratch the finish of the
floodlight. Torque to 19 in.-lbs. (2.2 N-m).
5.
Install floodlight per above instructions.
NOTE: Guard can be installed before or after floodlight has been in operation.
2019
With Guard Only
Figure 7
IF 1891
Revision 1
New 08/19