GE Evolve ERX1 Guia De Instalacion página 2

Luminaria led para vía pública
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1
UNPACKING
• This luminaire has been properly packed so that no
parts should have been damaged during transit.
Inspect
to
2
HANDLING
• Damage may occur if luminaire is improperly handled
outside of pack.
• Do not impact or stack luminaire after removal from
packaging.
3
MOUNTING
For installation to mounting arm:
• The pipe clamp accommodates 1 1/4 inch ((1.660 OD)
through 2 inch (2.375) pipe. If necessary, adjust the two
pipe clamp bolts so that opening is slightly larger than
pipe size being used.
Risk of injury or damage. Unit will fall if not installed
properly. Follow installation instructions.
• Insert mounting arm carefully into back of the luminaire
until it hits the leveling steps which stick down from top
of housing.
selecting
By
adjusted up or down with respect to pipe. A pad is
provided on top of housing for convenient application
of hand level.
• To mount, hold luminaire approximately level and
snug up bolts (4-5 foot-pounds).
-
If more upward tilt of front of luminaire is needed,
loosen the bolts slightly, lift luminaire and insert it
to the next set of leveling steps.
-
If downward tilt is needed, reverse procedure by
extracting the luminaire from the mounting arm
to sit on a more rearward set of steps.
WARNING
steps, the luminaire may be
• Once the proper level has been achieved, tighten
each bolt to 10-12 foot-pounds, alternating between
bolts.
-
If a torque wrench is not available, correct torque
may be achieved by turning bolts two to three full
turns (or until bottoming occurs) past their snug
position.
Under no conditions should bolts be torqued to level greater
than 12 ft-lbs. (16.3 N-m)
Pipe Clamp
4
WIRING
• NOTE: Make all electrical connections in accordance
with the National Electrical Code and any applicable
local code requirements.
• NOTE: Verify that supply voltage is correct by
comparing it to nameplate.
• Terminals are readily accessible on terminal board
and will accept service leads ranging in size from
AWG No. 16 through No. 6.
• Service leads (See
temperature rating) should extend through mounting
bracket approximately 7 inches.
• A wiring diagram is provided on a label inside
luminaire.
WARNING
labeling for supply wire

Publicidad

Tabla de contenido
loading

Tabla de contenido