Setting Up And Connecting; Set-Up Location Requirements; Electrical Connection - Silvercrest SFS 120 A1 Instrucciones De Uso

Envasadora al vacío
Ocultar thumbs Ver también para SFS 120 A1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 84

Setting up and connecting

Set-up location requirements

For safe and trouble-free operation of the device , the set-up location must fulfil
the following requirements:
When setting it up, place the appliance on a firm, flat and horizontal
surface.
Do not place the device in a hot, wet or extremely damp environment or in
the vicinity of flammable materials.
The mains power socket must be easily accessible, so that the power cable
can be easily disconnected in the event of an emergency.

Electrical connection

CAUTION
Before you connect the appliance, compare the connection data (voltage
and frequency) on the data plate with that of your mains power network.
These data must agree so that no damage is sustained by the device.
Ensure that the power cable is undamaged and is not routed over hot
surfaces and/or sharp edges.
Ensure that the power cable is not taut or kinked.
Do not let the power cable hang over edges (trip wire effect).
Insert the plug into the mains mains power socket.
SFS 120 A1
GB │ IE
 23

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sv 120 a1

Tabla de contenido