Lamborghini Caloreclima 310 PM/M-E Manual Para La Instalación Y El Mantenimiento página 46

Ocultar thumbs Ver también para 310 PM/M-E:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

DIAGRAM OPERATION TWO PROGRESSIVE STAGES
TC
PG
MB
PA
TR
VE
max.
M
MT
min.
EC
Legend
T11 Air shutter opening time, from 0 to max.
TW Begins with the closure of the thermostatic line
or the PG. The PA must be in the rest position.
This is the waiting and self-test time.
T10 Begins when the motor starts up and with the pre-
purge phase, within which the PA air pressure
switch must give the go-ahead.
T1
Pre-purge time.
T3
Pre-ignition phase, it ends when the gas valve
opens.
Input signals
Output signals
A
Begin start up
B
Flame present
B-C
Operation
C
Control stop
C-D
Air shutter closure + post-purge
TC-PG
Thermostats/Gas pressure switch line
T10
TW
T11
T1
0
T3
T2
T12
T4
T2
Safety time, within which the flame signal must
reach the EC electrode.
T4
Interval between the opening of the gas valve
and the opening of the second stage.
T6
Air shutter closing time and program zero-setting
time.
T12 Time in which the air shutter shifts to the start-up
position.
MB
Burner motor
PA
Air pressure switch
TR
Ignition transformer
VE
Gas valve
EC
Control electrode
MT
Air servo control
46
T6

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

430 pm/m-e

Tabla de contenido