Installation Check-Up; Hot Water - Cimbali PED Uso E Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 56
WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C).
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
GROUPS
Let each group dispense water for about a minute.

HOT WATER

Continuously dispense hot water (pressing the appropriate button) until at least 6 liters of water have been used
for a machine with 2 groups and 9 liters for a machine with 3 groups (see the "Hot water dispensing" chapter in the
User's Manual).
STEAM
Dispense steam from the nozzles for about a minute, using the appropriate buttons.

5. Installation Check-up

5 EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Desp

Tabla de contenido