Startup And Checkout - Honeywell True STEAM HM506 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Guide

startup and checKout

Slide the cover back into place and secure screw.
12
Turn on the water supply.
POWER
HUMIDIFYING
EMPTY
SERVICE
13
DRAINING
CLEANING
REQUIRED
DRAIN
GO
M24763A
Turn the humidity control to the "Test" position. If the "Test" position is unavailable,
14
turn the control to a high setpoint (60% +). Be sure to return the setpoint to the desired
level when testing is complete. "Off" will turn TrueSTEAM off.
Confirm that the furnace blower turns on to circulate air. This will take 10–15 minutes
15
after the call for humidity if TrueSTEAM is controlling the fan.
allow truesteam to produce steam, then check all water line connections to ensure
69-2285EFS—03
Plug in the TrueSTEAM power cord.
Press/release the GO button to ready
the TrueSTEAM for operation.
TrueSTEAM will ready itself after
five minutes if the GO button is not
pushed.
there are no leaks before leaving the job site.
14
M24762

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

True steam hm509True steam hm512

Tabla de contenido