Important!
For commissioning, the controller must be assembled
correctly, all inputs and outputs must be connected
and ready for operation, the strain relief device must
be screw-fastened and the terminal cover closed!
This is an explanation in terms of an example of commissioning of the
differential temperature controller Basic Pro; details vary along with
the hydraulic configuration and the software version.
Commissioning is communicated in plain text; the user must make a
selection, acknowledge and - if applicable - jump to the next menu item.
The differential temperature controller Basic Pro accompanies you during the
entire configuration and interrogates everything it must know for optimum operation.
Now, the power supply of the controller must
be switched on - the display screen appears.
0.1 Language
Deutsch
English
Français
Italiano
0.2 Date setting
Date
01.01.2000
Time
System 1/3
60°C
›0.1 Language‹ appears after
00:00
a short booting sequence.
Various languages are available
in this version of the Basic Pro.
Activate the required version and
acknowledge by pressing ›Next‹.
›0.2 Time/date‹ appears.
00:02
Press ›OK‹ - the hour is highlighted.
Turn the rotary encoder until the correct figure appears,
00:02
and acknowledge via the ›OK‹ button. The controller
Next
accepts the value and jumps to the minute setting.
In this way, all values for time and date
can be entered, and acknowledged by ›Next‹.
09:04
Now, the controller offers the hydraulic systems.
By turning the rotary encoder, the required system
can be selected (here system 1 of 3 possible ones)
and acknowledged via the button ›OK‹.
45°C
Commissioning mode
19