meibes Basic Pro Manual De Instrucciones página 66

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 140
Commissioning mode
›0.7 Checklist‹ appears.
Here, the submenus ›Test outputs‹ and
›HE output‹ are made available.
Select Test outputs and activate
by pressing the ›OK‹ button.
›0.7.1 Test outputs‹ appears.
Here, the output can be activated manually
via the ›OK‹ button to test the function of
the activated output or of the connected unit.
If the pump is not working properly, the plant
elements in question and the cabling must be
verified and repaired.
Acknowledge by pressing ›Next‹.
›0.7 Checklist‹ reappears.
The ›HE output‹ can be defined as ›WILO ST25/7
PWM‹, ›Solar pump analog‹, ›Solar pump PWM‹,
›Heating pump analog‹ or ›Heating pump PWM‹.
Acknowledge by pressing ›Next‹.
›0.9 End‹ appears.
By ›Next‹, the controller
changes over to ›Automatic mode‹.
Commissioning is complete.
As of this point, the Basic Pro controls
the solar thermal plant automatically.
20
0.7 Checklist
Test outputs
HE output
0.7.1 Test outputs
RO1
0.7 Checklist
Test outputs
HE output
Solar pump PWM
0.9 End
You have completed
commissioning!
System 1
60°C
09:05
---
Next
09:06
Next
09:07
Next
09:08
Next
09:10
45°C

Publicidad

Tabla de contenido
loading

Tabla de contenido