Star 4H05A05001 Manual Del Usuario página 12

Bomba para pozos sumergible de 10,16 cm
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ELECTRICAL HOOKUP AT THE PUMP
3. Slide one shrink tube over each crimped
joint. (Fig 3)
4. Hold a torch (not included) approximately 6
in. from the center of the tubing and move it
back and forth. Heat one set of wiring tubing
at a time until seal is completed. During the
heating process, keep all other wires/tubing
away from heat to prevent melting together.
Avoid overheating, as this may make the
tubing brittle. When liquid oozes from end
of tube, seal should be complete. (Fig 4)
CAUTION: Do not lift pump by power
cable or motor leads! Damage to cable or leads
will result.
Securing wires to pipe
5. Tape electrical cable to the pipe about every
ten feet. Use a minimum of two wraps of
tape to allow the cable to move slightly.
Tape spliced connections to the pipe to
eliminate rubbing against the well casing.
A cable guard or plastic zip ties may also be
used. (Fig 5)
Ground Wire Installation (REQUIRED)
DANGER: The green ground wire from
Pump motor must be connected to power
supply ground or fatal electrical shock may
result.
12
Copyright © 2011 Star Water Systems. All rights reserved.
3
Metal Connector
4
5
Shrink tube
IL1145
IL1146

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Productos relacionados para Star 4H05A05001

Tabla de contenido