THE BALMORAL
3
0
Roof and
3
0
Door
Assembly
Parts Needed:
10 Roof Joiner Panels
8 Roof Groove Panels
4 Roof Fascia Caps
2 Roof Fascia Cap
Covers
1 Left Door
1 Right Door
2 Door Sweeps
THE ENTIRE DOOR INCLUDING ALL WOOD MUST BE
PAINTED WITHIN THE FIRST 30 DAYS OF INSTALLATION
WITH A HIGH QUALITY EXTERIOR TRIM PAINT.
(Paint not included.)
Please sand doors lightly in order for paint to adhere properly.
3
3
Next, add roof groove panel and install screw
3
3
into ridge beam hole only where groove panel
meets joiner panel.
Continue to add roof panels and screws until
both sides of roof are built.
4 Door Pins
2 Door Handles
8 Door Handle Screws
#9 x 1" (2.54cm)
1 Slide Lock
2 Ridge Beam End Caps
Screws #10 x 3/4" (1.90cm)
(Right and left are
determined when facing the
front of the building.)
Lay out all the required
panels on the ground
around the building in their
proper sequence.
Working from the outside of the building, slide roof
3
1
3
1
joiner panel into fascia gable at rear of building.
Hint: Make sure panel is fully seated into the ridge
beam.
3
4
To verify that your door is standing properly, ensure that the two
3
4
larger panels are on top. The two smaller panels and the groove
for the door sweep are on the bottom. When the hinges plates
are installed the prongs on the hinge plate must face outward.
13
3
2
3
2
Install 1 screw
only into corner
of ridge beam
into hole nearest
outside wall.