Inspection Maintenance Schedule - Thermo King Ce-Serie Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 58

INSPECTION MAINTENANCE SCHEDULE

INSPECTION MAINTENANCE SCHEDULE
A closely followed maintenance program will also help to keep your Thermo King unit in top operating condition. The following general schedule is provided
to assist in monitoring that maintenance. Maintenance actions should be performed where applicable depending on the model.
UNIT MODELS Vehicle Powered Range
First Week Inspection Recommended
AFTER FIRST WEEK of operation:
Check belt tension
Tighten unit and mount bracket mounting bolts
Check for chafing of wiring harnesses and all hoses
Check refrigerant hoses, tubes and fittings for leaks.
Recommended
A
Every 500 hrs
Every 1,500 hrs
Or
Or
6 months
12 months
Miscellaneous
16
B
Every 3,000 hrs
Inspect/repair the following items
Or
24 months
These procedures may be carried out as an addition to the standard service procedures
* Check calibration of return and discharge sensors as per customers HACCP or annually. Also stand alone
loggers if installed. Testing not included as part of service time.
Check operation of all accessories.
Check service records and ensure all service and warranty modifications have been completed. (Updates not
included).

Publicidad

Tabla de contenido
loading

Tabla de contenido