D-Link DES-1024D Guia De Instalacion página 2

Ocultar thumbs Ver también para DES-1024D:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
Setup The DES-1024D 10/100M
Fast Ethernet Switch
The setup of the Switch can be performed using the following steps:
A.
The surface must support at least 5 kg.
B.
The power outlet should be within 1.82 meters (6 feet) of the device.
C.
Visually inspect the power cord and see that it is secured fully to the
AC power connector.
D.
Make sure that there is proper heat dissipation from and adequate
ventilation around the Switch. Do not place heavy objects on the
Switch.
Desktop or Shelf
Installation
When installing the Switch on a desktop or shelf, the rubber feet included
with the device must be first attached. Attach these cushioning feet on the
bottom at each corner of the device. Allow enough ventilation space
between the device and the objects around it.
Fast Ethernet Switch installed on a Desktop or Shelf
2

Publicidad

Tabla de contenido
loading

Tabla de contenido