3. Assemble (4) angle
brackets to the lower hood
mounting locations using
(8) M4 x 10mm pan head
machine screws (2 for each
angle bracket).
4. Determine dimension "H"
based upon ceiling height
and height of hood installa-
tion above cooktop:
7-FT. 8-IN. CEILING
Hood 30" above cooktop
H = 30"
Hood 29" above cooktop
H = 27"
8-FT. CEILING
Hood 24" above cooktop
H = 36"
Hood 30" above cooktop
H = 30"
9-FT. CEILING
Hood 30" above cooktop
H = 42"
5. Attach the upper set of (4) angle brackets to the outside of the lower angle
brackets according to dimension "H" . Use (16) M4 x 10mm pan head machine
screws and (16) M4 serrated flange nuts (4 at each angle bracket connection).
6. Attach the angle bracket assemblies to the upper hood mounting locations
using (8) M4 x 10mm pan head machine screws (2 for each angle bracket).
(16) M4 x 10mm
PAN HEAD
MACHINE
SCREWS &
(16) M4
SERRATED
FLANGE NUTS
1
7
/
1 6
"
- 12 -
(8) M4 x 10mm
PAN HEAD
MACHINE
SCREWS
(8) M4 x 10mm
H
PAN HEAD
MACHINE
SCREWS