Kohler K-9925 Guia De Instalacion página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1/4" Furring Strip
Stud
Drill 1/8" (3 mm) holes
through nailing-in flange.
Attach drain to P-trap.
3. Prepare the Receptor
CAUTION: Risk of product or property damage. Do not support the shower receptor by the rim.
The weight of the shower receptor should be supported by the bottom of the shower receptor.
CAUTION: Risk of product or property damage. If a watertight seal on the drain is not obtained,
water damage to the receptor bottom and the subfloor may occur.
Install the drain to the shower receptor according to the drain manufacturer's instructions.
Move the receptor into place. Make sure the receptor rests on the leveling pads provided. When
leveling the receptor, shimming may be necessary. Make sure the receptor is level before fastening to
the stud framing.
Clean the shower receptor to reduce the risk of surface damage, then place a clean drop cloth or
other similar material into the bottom of the shower receptor.
4. Secure the Receptor
Drill 1/8" (3 mm) holes through the nailing-in flange at all stud locations. If needed, shim between
the nailing-in flange and the stud to prevent cracking while drilling and to remove any gap between
the studs and the nailing-in flange.
Attach the drain to the P-trap according to the manufacturer's instructions. Follow all local building
codes, standards, and regulations.
Attach 1/4" furring strips to the studs around the receptor.
Secure the nailing-in flange to the studs with screws or galvanized nails.
Install the faucet valving. Open the water supplies and check all connections for leaks.
Run water into the receptor and check the drain connection for leaks.
1087934-2-A
Nailing-In
Flange
Screw/
Galvanized Nail
Subfloor
6
Check
level here.
Check
level here.
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-9928K-9996K-9997K-9998

Tabla de contenido