Complete The Installation - Kohler K-9925 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Install the Finished Wall
IMPORTANT! If the shower receptor is adjacent to vertical ducts or wiring, the shower receptor must be
surrounded with fire-rated, water-resistant wall material.
Install the cement board with the factory edge a minimum of 5/8" (15 mm) above the finished,
nailing-in flange threshold of the shower receptor. Finish all seams using appropriate materials.
Apply silicone sealant to the upper portion of the nailing-in flange where it will meet the
water-resistant wall material.
Ensure the cement board is sealed to the nailing-in flange.
Mud, tape, and finish the cement board using appropriate materials.
Seal the joints between the receptor and the finished wall with silicone sealant. RTV (Room
Temperature Vulcanizing) sealant is recommended.

6. Complete the Installation

NOTE: Refer to the sealant and/or putty manufacturer's instructions for proper application techniques.
Seal around the valving and outlets with silicone sealant or plumbers putty.
Install the shower door according to the manufacturer's instructions.
Install the finished floor.
Apply silicone sealant along the front edge of the receptor where it meets the floor.
Place the removable cover in the recessed area around the drain. Lightly push down on the
removable cover to secure the suction cups to the receptor.
Kohler Co.
Finished Wall
Check walls
for plumb.
Factory
Edge Down
Nailing-In Flange
Threshold
Removable
Cover
7
Cement Board
Furring Strip
5/8"
2x4
(1.6 cm)
Framing
Min
Galvanized
Screw/Nail
Silicone Sealant
1087934-2-A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-9928K-9996K-9997K-9998

Tabla de contenido