Rack Assembly
7
Insert the rear base bracket's holes through the rear threaded
M8 studs of the bottom side brackets
bracket's holes through the rear threaded M8 studs of the top
side brackets
B
.
8
Insert the left rear vertical mounting rail's holes through the rear
threaded M8 studs of the bottom and top side brackets
Then insert the right rear vertical mounting rail's holes through the
rear threaded M8 studs of the bottom and top side brackets
Fasten with two M8 acorn/cap nuts
9
Optional Cable Management Hooks: Fasten the included cable
management hooks
A
to the vertical rack rails with the included
screws
B
.
A
. Then insert the rear top
A
.
B
.
and an M6 Screw
.
C
D
7
C
A
8
9
5
B
A
C
D
B
C
D
A
B
A