Step 9: Roof assembly
Step 9a:
Slide Roof Panel (RP) into track and push into the Sky Light
until locked in position. (Snap should be aligned before
applying pressure to insert the snap into locked position).
This should be repeated 6 times until roof is complete.
click
TM
Assembly Instructions
click
- 32 -
This step requires:
6 - Roof Panels (RP)
NOTE:
Second person should apply
downward pressure on opposite
side of the Sky Light, while roof panels
are pushed into place. Roof Panels
will snap into position