4
Mechanical installation
Preparation
4
Mechanical installation
4.1
Preparation
Mounting and wiring of the wiring unit and communication unit must be
completed in accordance with the mounting instructions.
Before continuing and completing the installation of the 8400 motec, decisions
regarding parameter setting and commissioning must be made. This
determines the next steps.
Shall the controller be parameterised with the L−Force »Engineer« or with the
diagnosis terminal?
Mount the drive unit
ƒ
Shall the controller be preset with DIP1, DIP2, P2 or P3?
Make settings according to the requirements
ƒ
–
The "Settings" chapter contains the required information.
Mount the drive unit
ƒ
Is the controller part of a drive package?
The controller is factory−set in accordance with the motor and gearbox.
ƒ
Do not change factory settings!
ƒ
Mount the drive unit
ƒ
48
l
EDK84DGDVBxxx4 DE/EN/FR/ES/IT 6.1