Descargar Imprimir esta página

Publicidad

Idiomas disponibles

Idiomas disponibles

Ingeteam

4.2.1 A65

The protective covers protect against direct electrical contact. They should be removed in order to
make the connections and replaced once the connections have been made.
Make the connections as shown in the following figures.
Single phase installation *
* A bridge should be made between points 1 and 4 of the
wattmeter.
The wattmeter must be installed upstream from the installation that consumes
and generates the power to be managed.
8
INGEREV SMART DLM
Three phase installation
ABW2012IQM01_.docx

Publicidad

loading