Fuel Bed Setup Instructions - Twin-Star International 36II100GRG Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation - Wall Hanging (continued)
Operation
4
Attaching the Mounting Bracket
Attach the Mounting Bracket (A) to the wall by fastening
the four Anchor Screws (AA) into the wall anchors.
A
6
Hanging the Front Frame
Hang the Front Frame (C) on the Fireplace (B) and gently
push on the lower part of the frame until it snaps into
place.
B
A113
Operation
AA
C
11
5
Hanging the Fireplace
Hang the Fireplace (B) on the hooks at the bottom of
the Mounting Bracket (A) and push the Fireplace (B)
into the Mounting Bracket (A).
Re-fasten the two screws removed in Step 1.
7
Securing the Front Frame
Secure the top frame hooks with the two retaining
Screws (CC).
Continue to the fuel bed setup instructions (Page 18).
A
B
CC
www.tsicustomerservice.com

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

47ii100grg

Tabla de contenido