Inlet Baffle In Final Sedimentation; Overflow Baffle On Dividing Wall - Graf Carat S Instrucciones Para El Montaje

De una depuradora lecho fluidizado xxl en un tanque de aclarado
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.8

Inlet baffle in final sedimentation

The supply pipe from the bio chamber to the final
sedimentation is fitted on an inlet baffle. This consists of a
DN 100 T-piece and a DN 100 pipe and is screwed on to the
dividing wall with two pipe clamps.
4.9

Overflow baffle on dividing wall

The overflow on the dividing wall in the final sedimentation is
accomplished with a T-piece and a downpipe in DN 70. The
position of the overflow is shown in section 4.1.
A DN 70 lip seal should be inserted in the drilled aperture.
The short DN 70 HT pipe is guided by the lip seal and the T-
piece can then be fitted on top of this on the side of the
second
chamber.
The
downwards with the longer DN 70 HT pipe.
info@graf.info
www.graf.info
4.
Fitting the set-up kit
T-piece
should
be
17 / 40
Supply from
bio chamber
extended

Publicidad

Tabla de contenido
loading

Tabla de contenido