A Name
D Panel Mounting Bolt
B Qty
2(long)
C Shape
<Accessories Positions>
The decorative panel described in this
manual has the enclosed parts
attached to the location indicated in
Figure 1.
*The accessories are stuck to the packing
cardboard.
B Ceiling opening
dimension in the
short side
C Main unit
I Set the ceiling opening
ends to this
range.(Recommended
10mm)
2
2(short)
Diagram 1
Model
A Spirit level
CMP-VLW-C
direction
G Install panel gauge in the direction
suitable for the short side direction
and the long side direction as
shown in the diagram.
F Panel gauge
F Truss Bolt (Only in the
E Tie Anchor
case of model 100, 125)
2
I Top of the
J Panel
cardboard
H Panel gauge
A
57 mm - 67 mm
H Ceiling opening ends
Diagram 2
G Washer (Only in the
case of model 100, 125)
2
L Accessories
K Bottom of the
cardboard
D Check to see that the main unit is level
using a spirit level.
E Ceiling opening
dimension in the long
side direction
F Panel gauge
C Main unit
I Set the ceiling
opening ends to this
range.(Recommended
10mm)
2