5
Commissioning
Before commissioning: assign a valid AS−Interface address
to the SPC11 (see system manual for the SPC11−...−ASI).
Caution
In order to avoid damage caused by uncushioned
movement into the end positions, make sure in the
following cases that you observe the safety instructions
as well as the information on how to proceed in the
manuals for the SPC11.
when first commissioning
after adjusting the fixed stops
after replacing components.
Instructions on commissioning the SPC11 as supplied from
the factory (without pre−parametrizing) or with the AS−In
terface with slave profile 7.4 can be found in the system
manual for the SPC11−...−ASI.
If the SPC11 is already pre−parametrized, carry out com
missioning as follows:
1. Before commissioning:
S Switch off the compressed air and the power supply.
S Mount the maximum permitted mass load and the
2. Disconnect the connection to the AS−Interface bus
(yellow cable).
3. Switch on the operating voltage supply (black cable).
24
fixed stops.
Festo SPC11−...−ASI 0511b English