Chapter 3 Preparation for installation
3.1 Unpacking:
All packing, loading/unloading, transport and unpacking operations must be performed by professional personnel.
Transport:
1 ) The cargo shall be loaded/unloaded and moved by a lifting machine and forklift with capacity over 3 tons. To prevent the cargo
falling off, one person shall pay attention to the cargo during the lifting operation for fear of accidents. The cargo shall be
transported by motor vehicle or ship.
2) The cargo shall be inspected for completeness when it arrives, for fear of damage or loss during transport. If the packing
box is broken during transport, inspect the broken box according to the Packing List, confirm the damaged articles and lost
components, and at the same time, inform the carrier immediately.
3) The lift is heavy cargo. Therefore, loading/unloading by hand is forbidden. Safety in handling is of much importance. In addition,
during loading/unloading the cargo shall be hoisted as illustrated.
Storage:
Machinery equipment shall be stored in an indoor warehouse, and waterproof protection shall be used in case of outdoor storage. A
van truck shall be used for highway transport, and a container for waterway transport. The control cabinet must be placed upright
during transport and be protected from squeezing by other goods.
3.2 Installation:
1 ) Only professionals are allowed to conduct the installation work. They shall read and follow the operation instructions
below carefully to prevent machine damage or injuries
2) Only authorized technicians are allowed to install the lift
3.2.1 Installation requirements:
1 ) The lift must be installed in accordance with the specified safe distances from walls, columns and other equipment(as shown
in Fig. 17), including the minimum distance 1000mm from walls. To prevent any emergencies and for the convenience of
operation, a sufficient space for exit passageway shall also be considered.