4.2.3 Turn the Work/Adjust switch to the Adjust position and set the red handle of the Main Lift high-pressure valve to the Open position.
Work
Adjust
4.2.4 Lift the sub-lift (to a height not greater than the main lift), and then lower it. It is recommended to repeat this step 3 times.
Main lift
The height of the sub-lift shall not be greater than that of the main lift
4.2.5 Taking the main lift as the benchmark, lift the sub-lift to place the main lift and sub-lift at the same level, and turn the red handle
to close the high-pressure valve. When the main lift and sub-lift are adjusted properly, set the Work/Adjust switch to Work, and
set the time relay to 1.5~2s.
Main lift
Sub-lift
Oil filling instructions for Sub Lift
4.2.6 Turn the changeover switch on the control panel to the "Main lift" position, set the time relay to 0, and connect the air supply.
Main Lift
Sub Lift
56
AE5302/AE5302-3
Open
Red handle
Sub-lift
Close
中文
The height shall not be
greater than that of the
main lift
Red handle
After oil filling
of Main Lift
and Sub Lift
Air
Connect the air supply
EN
DE
RU
KO
PT
Work
Adjust
JA
ES