fortress Pure View Instrucciones De Instalación página 14

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 3:
Install Full Glass Into Bottom Rail
1� Carefully position full glass sheet into the center of the bottom
rail� As shown in Fig� 1�
2� Insert spacers on either side of the glass in the bottom rail�
Spacer will be flush with the side of the glass�
As shown in Fig� 2�
3� Spacers might need to be cut shorter for bracket set screw
clearance�
Tip:
• Be sure to wear safety gloves & glasses when handling glass�
Fig. 1
Step 4:
Install Top Rail
1� Carefully slip Top Rail over the top of the glass into the top
Bracket Cups�
2� Use a rubber mallet and a wood block to drive the top rail on
to the glass� As shown in Fig� 2�
3� Pre-drill Bracket Cup holes for screws using a 3/16"
[89�5mm] drill bit�
4� Secure top rail to Bracket Cups with provided T-25 Drive
Thread-Cutting Screws� Use low speed setting on drill�
Fig. 1
Top Rail
14
Glass
PURE VIEW: Al
FULL GLASS PANEL INSTALLATION
13
Fig. 2
Spacer
Gasket
Glass
Bottom Rail

Publicidad

Tabla de contenido
loading

Productos relacionados para fortress Pure View

Tabla de contenido