fortress Pure View Instrucciones De Instalación página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 3:
Max Post Spacing
• 68-1/2" [1740mm] Pure View Full Glass Rails maximum post
spacing is 68-3/4" [1746mm]�
Note:
• Do not exceed the maximum post spacing.
Fig. 1
68-1/2" [1740mm] rail maximum post
spacing is 68-3/4" [1746mm]
Step 4:
Mount Posts
1� Mark mounting hole locations and pre-drill a 3/8" [9�5mm]
hole�
2� Insert 3/8" x 3-1/2" [9�5mm x 89mm] Hex Head galvanized
bolts through 3/8" [9�5mm] galvanized washer and post
base plate�
Note:
• Post Base Plate holes MUST be positioned a minimum ½"
[12�5mm] from edge of deck board�
• Use only 3/8" [9�5mm] Hex Head Galvanized Bolts� Lag
Screws should NOT be used� Secure each post with four bolts�
Fig. 1
Fig. 2
PURE VIEW: Al
FULL GLASS PANEL INSTALLATION
13
7

Publicidad

Tabla de contenido
loading

Productos relacionados para fortress Pure View

Tabla de contenido