Electrical Connection - FRICON CLS Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 61
SMR
• Push the equipment through structural areas and do not push through areas
with glass, as shown in the example in Fig.6.
WARNING
• Put water in the defrost water drain corner
(about 15cL) of the equipment.
5.1. Placement and adjustment of levelers
• To place the leveler (Fig.7) it is necessary to lift the equipment.
• First place the leveler on the foot of the equipment by hand, as shown in Fig.8.
• With the equipment in position, it is possible to adjust it with a No. 36 spanner
in order to level the equipment, as shown in Fig.9.
Fig. 7–Leveler

6. Electrical Connection

NOTES:
• Connect the appliance to an outlet that is properly grounded. Said connection is
mandatory.
Fig. 6 - Example of allowed Push zones
Fig. 8- Placement of the
leveler at the foot of the
equipment
41
English
Fig.9- Leveling
adjustment

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Smr clLsmrSmr daSmr slb

Tabla de contenido