RECOMMENDED INSTALLATION FOR ALL APPLICATIONS
1. E lectrical wiring and protection must be in accordance with governing
electrical codes.
2. I nstall proper Zoeller Unicheck (combination union and check valve),
preferably just above the basin to allow easy removal of the pump
for cleaning or repair. If high head or below-cover installation is
required, use 30-0164 on 1-1/2" (DN40) pipe, 30-0152 on 2" (DN50)
pipe and 30-0160 on 3" (DN80) pipe.
3. All installations require a basin cover to prevent debris from falling into
the basin and to prevent injury.
4. W hen a Unicheck is installed, drill a 3/16" (5 mm) diameter hole in the
discharge pipe even with the top of the pump. NOTE: THE HOLE
MUST ALSO BE BELOW THE BASIN COVER AND CLEANED
PERIODICALLY. (High Head unit see "Caution" on front page). Water
stream will be visible from this hole when pump is operating.
5. S ecurely tape or clamp power cord to discharge pipe, clear of the float
mechanism(s).
6. Use a discharge pipe equivalent in diameter to the pump's discharge.
See FM0531, FM0732, FM1597 & FM1420 for
alarms, controls & junction boxes
1
10
2
12
13
3
MINIMUM
18"x24" BASIN
(457 mm X 610 mm)
5
LARGER DEPTHS
MAY BE
6
REQUIRED.
4
7
8
14
9
4" (10 cm) OF GRAVEL
TYPICAL DEWATERING INSTALLATION
All installations must comply with all applicable electrical and plumbing codes, including, but not limited to, National Electrical Code, local, regional, and/or state plumbing
codes, etc. Not intended for use in hazardous locations.
On some installations, it may be desirable
to install an independent hanger for the
level control switches to avoid possible
hang-ups on the pumps, piping, valves,
etc. Float hangers are available from
Zoeller Company on Catalog Sheet
FM0526 or can be fabricated from
standard pipe and fittings.
Always refer to
FM0551 and/or
SSPMA recom-
mended sewage
pump installation
and maintenance.
TURN
ON
TURN
OFF
SK292
TYPICAL SEWAGE INSTALLATION
Suggested Methods of Float Installation
TYPICAL FLOAT HANGER ON STEEL COVER PITS
PEA GRAVEL
© Copyright 2016 Zoeller
7. B asin must be in accordance with governing codes and specifications.
8. P ump must be level and float mechanism(s) clear of sides of basin
before starting pump.
9. Basin must be clean and free of debris after installation.
10. G ate valve, shut-off valve, or ball valve to be supplied by installer and
installed according to any and all codes.
11. L ocate float switches as shown in sketches. The best place for the "off"
point is above the motor housing and positioned 180° from the inlet.
Never put "off" point below discharge on pump
12. Gas-tight seals are required to contain gases and odors.
13. V ent gases and odors to the atmosphere through vent pipe.
14. Optional pump stand (P/N 10-2421) eliminates the need for blocks or
bricks under the pump. For use with effluent and dewatering pumps only.
15. O ptional watertight control box available, see FM1597 for details.
16. For proper spacing of "On" - "Off" switches refer to local or
national standards and guidelines.
17. Optional septic tank risers for easy access to pump, controls and filters.
See FM0531, FM0732, FM1597 & FM1420
for alarms, controls & junction boxes
4" (100 mm)
OF GRAVEL
SK290
ACCESS COVER
STANDARD PIPE
FLANGE
PVC OR LIGHT WEIGHT
STAINLESS STEEL PIPE
SK1217
Co. All rights reserved.
®
3
WW1
EFFLUENT
FILTER
TYPICAL EFFLUENT INSTALLATION
TYPICAL FLOAT HANGER ON CONCRETE PITS
OR SEPTIC TANK RISERS
10-1457 FLOAT TREE
WITH 3 FLOATS SHOWN
TYPICAL FLOAT HANGER ON CONCRETE PITS
OR SEPTIC TANK RISERS
SK291
SK1218