Honeywell Friedland GlobalGuard FGGK Serie Manual De Software página 8

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 72
3.1.4.3
SCHEDULE
A schedule is a set of multiple actions activated when the preset time is reached. For example, you can create a schedule to
switch a table lamp connected to an on/off device on at 6 p.m. and off at 11 p.m. on a daily basis or on particular days.
Item
NAME
NUMBER
SCHEDULE
Step 1:
SET START TIME
Step 2:
ACTIVATE ACTION1
Step 3:
SET ACTION TIME
(optional)
Step 4:
ACTIVATE ACTION2
(optional)
3.1.4.4
DEVICE
Description
Name of the schedule.
Number of the schedule.
Status of the schedule:
Select "ENABLE" to activate the schedule.
Select "DISABLE" to deactivate the schedule.
SET ACTION TIME: Set the start time before Action1 is activated.
ADVANCE SETTINGS: Set the security mode.
Set the action to be taken when the trigger has been initiated:
CONTROL DEVICE: Select a control device to control devices (max. 16).
PROGRAMMES: Select a program to activate.
Set the delay time before Action2 is activated.
Set another action to be taken:
CONTROL DEVICE: Select a control device to control devices (max. 16).
PROGRAMMES: Select a program to activate.
To add and maintain up to 32 schedules.
To view and maintain a device.
8

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Friedland globalguard hisk1

Tabla de contenido