Spring units load
Manual blinds width (mm)
indicati ve chart
Recommended preload with sheet rolled up (no. of windings)
Sprin max load with the sheet rolled completely (no. of wind-
ings)
Installati on pro-
cedure
automated blind
20. Maintenance and cleaning
DANGER! Live parts. Electrocuti on.
REMOVE THE ELECTRIC POWER SUPPLY BEFORE ANY OPERATION!
DO NOT wet, spray water or clean directly the electrical parts of the cabinet (fans, inte-
rior lighti ng, electrical cables etc. )
DO NOT touch the cabinet with wet or damp hands and feet.
CAUTION! Cold surfaces. Injuries, burning. Glass breakage.
Wait for the glass parts to reach room temperature.
DO NOT use hot water on the cold glass surfaces.
Protect the hands with work gloves.
i
The products will damage due to germs and bacteria.
Compliance with Hygiene Standards and the cold chain is indispensable to guarantee the
protecti on of the consumer's health.
The cleaning operati ons must include:
Step
Name
1
Washing
Saniti zati on
2
3
Rinsing
4
Drying
20. 1 Cleaning products
Best
- clean water at maximum temperature of 30°
- soft cloth
(Fig.21)
- mild and neutral detergents
Do not use
- cleaners or similar products to clean the parts in methacrylate (Plexiglas)
- in powder
alchool-based
- with granules
(Fig.20)
- either acidic or alkaline (bleach, ammonia)
- concentrates
- with unknown chemical compositi on
- abrasive products, chemical/organic solvents
- abrasive sponges, scourers, sharp tools
- aggressive solvents (aceti c acid, citric acid etc.)
05060167 00 09-08-2016
Step
1
insert stopper F, turn it and lock it in housing D
2
insert the blind using pin G
3
insert the opposite stopper, repeat step 1
roughing, removal of approximately 97% of the dirt)
cleaning+disinfecti on:
- cleansing: removal of visible dirt
- disinfecti on: removal of pathogenic micro-organisms that remain
aft er washing
Acti on
Descripti on
Lisbona 2
English
<1250 >1250
20-30 25-30
50
55
47