Tools Needed; Materials Needed - Bosch SHU Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TOOLS NEEDED

Hammer
Tape Measure
Wire Cutter

MATERIALS NEEDED

(Additional materials may be required to comply with local codes.)
Electrical Supply Cable - Minimum #14 AWG, 2 conductor, 1 ground, insulated copper
conductors rated 75°C or higher.
Hot Water Supply Line - Minimum 3/8" O.D. copper tubing or metal braided dishwasher
supply line.
Shut-off valve and fittings appropriate for hot water supply line (copper tubing/
compression fitting, or braided hose).
90° elbow with 3/8" N.P.T. male threads on one leg, and sized to fit your water supply
line (copper tubing/compression fitting, or braided hose) on the other leg.
Teflon tape or other pipe thread compound to seal plumbing connections.
UL listed conduit connector or strain relief.
2
Tools and Materials Needed
Hole Saw
Slot Screwdriver
Wire Stripper
Pipe Wrench
Phillips Screwdriver
Drill
Adjustable Wrench
T-20 Screwdriver
Level

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

SheShiShv

Tabla de contenido