Lamborghini Caloreclima PM/2E Serie Manual De Instalación Y Manteniemiento página 50

Quemadores a gas con dos llamas
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

210 PM/2-E
L1
L2
L3
N
230V-5A-F "POLVERE QUARZO"
230V-5A-F "SAND FILLED"
IG
230V-5A-F "FUSIBLE AU SABLE"
230V-5A-F "SANDGEFULLTE SCHMELZ"
230V-5A-F "RELLENO DE ARENA"
F
L1
L2
L3
N
F
FA
L
N
BRM
RM
LR
RT
CT
MB
230 V
400 V
1
2
2
MPE
(LFL..)
LEGEND
BRM
Motor relay coil
Connector seal check
C.CT.
CT
Thermal relay contact
C.VE.PG. Connector gas valve-gas pressure
Control electrode
EC
F
Fuses
Anti-disturbance filter
FA
IG
Main switch
Ima
On/Off switch
Operating light
LF
LP
Lamp presence flame
Blocking-mode light
LR
LR1
Blocking-mode light (if present)
MB
Burner motor
MMS
TC
TS
LR1
LR
ST
AT
L1
9
U1
U3
LF
PS
Ima
2
2
3
4
5
6
7
8
9
10
1
2
N
10
9
3
4
8
3
6
2
5
1
4
3
6
2
5
1
4
8
7
6
5
4
3
2
1
LP
TR
PA
11
12
13
14
15
16
17
18
19
20
Servo control motor terminal board LANDIS SQN 30...
MMS
MPE
Control box terminal board - LANDIS LFL1.322
Transmission terminal board
MR
PA
Air pressure switch
PGm
Minimum gas pressure switch
Release-reset pushbutton
PS
RM
Motor relay contacts
Thermal relay
RT
TC
Boiler thermostat
Tmf
2nd flame modulation thermostat (if present)
TR
Starting transformer
VDK
Seal check
Main valve
VP
VS
Safety valve
5
13
11
7
6
(SQN..PM/2)
3
2
1
3
2
1
MR
EC
21
22
23
24
31
32
50
C.CT
VDK
1
VP
2
VS
PGm
C.VE.PG

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

55pm/2e70pm/2e90pm/2e140pm/2e210pm/2e

Tabla de contenido