Repeat, if necessary, the sequence of
leveling and fixing operations for the re-
maining equipment.
INTRODUCTION
(OPTIONAL) / see SECT. IMAGES
- REF. c) / In order to introduce the
Before proceeding with the
operations, see "General sa-
fety information".
These operations must be per-
formed by qualified and au-
thorised operators, in accord-
ance with the laws in force and using
the appropriate materials described.
Generally the appliance is de-
livered without electric mains
supply cable, without pipes
for connection to the water, drain-
age and gas networks.
CONNECTION OF WATER SUP-
PLY / see SECT. IMAGES - REF. d)
Make sure these conditions are sati-
sfied to obtain a correct installation:
The equipment must be supplied
1.
with tap water with a working pres-
sure included from 200 kPa up to
400 kPa and it must also ensure a
minimum flow rate of 1.5 l/min.
The water entry pipe must be con-
2.
nected to the distribution network
through a cutoff cock (easily re-
cognizable and ac-cessible by the
operator) that must be closed when
the ap-pliance is not working or
during maintenance interventions
(Fig. 1).
Install a mechanical filter between
3.
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
POSITIONING AND HANDLING
OF
TERMINAL
POWER SUPPLY CONNECTIONS
- 10 -
terminal, position it and fix it with the
equipped screws provided (detail L1).
Once the described operations have
been carried out, position again the
panels and knobs of the different ap-
pliances in the respective housings.
the cutoff cock and the appliance
connection pipe, in order to pre-
vent the introduction of any ferrous
dross, which oxidize, and which
therefore could corrode and with
time cause the oxidation of the tank.
It is advisable before con-
necting the last section of the
attachment to allow the outflow
of a certain amount of water to flush
the pipe of any ferrous slag.
Connect one end of the supply pipe
•
to the attachment of the appliance
(Fig. 2);
Connect the other end of the pipe
•
provided with filter to the check val-
ve (Fig. 3-3F).
Open the check valve and visual-
•
ly check the tightness of the con-
nection (Fig. 4).
WATER SPECIFICS /
Hardness: Softened Max. 7°TH
(5°e, 4°dH, 70ppm) / Quality:
Chloride Cl-: 100 mg/l max. / Chlorine
Cl2: 0.2mg/l max / Conducivity: Min
20 μS/cm
CONNECTION TO GREY WATER
DRAINAGE SYSTEM / see SECT.
IMAGES - REF. d)
A correct installation requires the fol-
lowing conditions:
4.