A
D
E
To install the chute deflector and
chute rotator head
1. Put the chute deflector assembly on the top of
the chute base with the discharge opening in the
direction of the front of the product.
2. Put the chute rotator head (A) on the chute
bracket (B). Rotate the chute assembly to align
the pins under the chute rotator head with the
holes in the chute bracket if it is necessary.
3. Put the chute rotator head on the pin (C) and the
threaded stud (D) on the mounting bracket (E).
4. Attach a locknut (G) on the threaded stud and
tighten.
A
10
C
G
F
B
D
C
E
5. Put the cables through the cable guide (F) and
the double clip (I) to attach the rotator cable (H)
to the lower handle.
I
To install the chute deflector remote
control
1. Attach the remote cable bracket (A) to the
discharge chute with a carriage bolt (B) and a
5/16-18 locknut (D). Tighten the bolt.
2. Install the remote cable eyelet (E) to the chute
deflector (F) with a shoulder bolt (G), a nylon
washer (C), and tighten with a ¼-20 locknut (K).
The cable eyelet will be loose on the shoulder
bolt.
3. Attach the spring (L) between the hex nut (M) on
the chute rotator head and the hole on the chute
deflector.
G
C
E
K
D
A
4. Attach the lever control knobs (N) by pressing
them down on the control levers (O).
H
F
F
L
M
B
694 - 003 - 07.11.2019