Duct Cover Installation; Accessories - KOBE CH7630SQB Intrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Duct Co ver Installation
6. Mark the position of the inner duct cover-
mounting
bracket
reference
E
Measurements and Diagrams on page 20-21.
Attach and secure inner duct cover-mounting
bracket {J} with two screws (not provided) to
the wall. Refer to Figure 15. NOTE: Inner
duct cover will be attached to the mounting
bracket.
7. Use 7 round steel pipe (follow building codes
in your area) to connect the round exhaust on
the hood to the ductwork above. Use duct
tape to make all joints secure and air tight.
8. Slide the inner duct cover up 2 inches
before sliding the entire duct cover onto the
hood. Refer to Figure 16.
9. Adjust the height of the inner duct cover to the
inner
duct
cover-mounting
Secure the inner duct cover with two (1/8 x
3/8 ) screws (provided).
10. Fasten outer duct cover to outer duct cover-
mounting bracket {K} with two (1/8 x 3/8 )
screws (provided) as shown in Figure 17.

Accessories

11. Drop oil tunnel into recess support near rear
of hood. Refer to Figure 18.
12. Install baffle filters and stainless spacer(s).
Refer to Measurements and Diagrams on
page 22 for baffle filter and stainless spacer
placement. Angle baffle filter toward back of
hood c. Push baffle filter up until almost level
d. Slide forward into recess behind the front
of hood e. Lower baffle filter f. Slide back
until it fits into resting position g. Refer to
Figure 19.
13. Repeat step 12 to install all baffle filters and
stainless spacer(s).
{J}
(provided).
from
TABLE
2
bracket
Figure 15
Use
and
Figure 16
{J}.
Figure 17
Figure 18
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ch7636sqbCh7642sqbCh7648sqb

Tabla de contenido