Delta MultiChoice 13 Serie Manual Para Propietarios página 5

Ocultar thumbs Ver también para MultiChoice 13 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Showerhead and Tub Spout Installation
2
A.
1
3
2
4
B.
58045
58045
2
1
B.
58065
58045: To combine the two showers, insert the top tab (1) on the handshower into the slot (2) of
B.
the showerhead. Push the handshower into the showerhead until the two parts snap together.
58065: To combine the two showers, push the handshower into the showerhead, then pull down
on the handshower until locked with the showerhead.
If the showerhead moves when removing the handshower, hand tighten the connection between
the showerhead and the shower arm.
To change spray modes, turn the lever (3) left or right to the desired setting. Turn knob (4) to
change between showerhead only, showerhead and handshower or handshower only.
FOR SHOWERHEAD INSTALLATION: Connect top
arm into riser connection. Thread showerhead (4) onto
shower arm. Apply plumber tape to pipe threads on both
4
3
4
3
4
Showerhead and Tub Spout Installation
2
FOR TUB SPOUT INSTALLATION:
use PEX tubing for tub spout drop.
C-1
2
1
C-2
1
C-3
1
3
2
Installation
Slip-On Installation
The copper tube (1) must be 1/2" nominal
copper. Important: If it is necessary to cut the
copper tube, the end must be chamfered free of
burrs to prevent cutting or nicking O-ring inside
screw (2), but do not overtighten.
Iron Pipe Installation
Install threaded pipe nipple (1) to extend past
pipe nipple and screw on tub spout.
Copper Sweat Installation
Remove O-ring (1) from adapter (2). Solder
adapter to tube taking care to keep solder away
Cut off tube (3) and replace O-ring on groove of
brass adapter. Thread tub/spout onto adapter,
taking care not to damage O-ring, and hand
and all slack is taken up behind wall.
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Multichoice 14 serie

Tabla de contenido