Important; Pre Operation - Skymsen PS-22 Manual De Instrucciones

Ocultar thumbs Ver también para PS-22:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Floor plan of the area recommended for installation of the equipment.
2.1.2 electrical installation
This equipment was developed for 110, 220 or 230 V (single voltage according to
esquipament purchased). Upon receiving the equipment check the voltage listed on the
label electric cable.
The power cord has 3 (three) pins, where the center pin is the ground pin-earthed
(grounded). It is mandatory that the three points are properly connected before the
equipment.
Make sure that the voltage of the power source where the equipment will be
installed is compatible with the voltage indicated on the label on the power cord.

2.2 Pre Operation

Before using your equipment, should you wash all parts that come into contact with the
product to be processed, with water and neutral SOAP (see item 3.4 cleaning).
Verify that the equipment this firm in your workplace.
When mounting the full mouth, do not over tighten the wheel no. 03 (fig. 01), thus
avoiding locking or breaking of the internal components.
700mm
Installa�on
Area
Lorem ipsum

IMPORTANT

IMPORTANT
FRONT
350mm
7

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido