STEINEL Studioline 400 Instrucciones De Montaje página 10

Ocultar thumbs Ver también para Studioline 400:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 33
L400_10spr.qxd
31.07.2008
Installation
Wall Mounting
Caution: The installation
involves connecting the
unit to the power mains.
The line voltage can be
lethal! So first switch off the
power and check that the
circuit is dead with a
voltage tester.
Pull out the wall mount.
Do not undo the internal
wiring of the lamp-wire
connector, but extract the
whole connector by pulling
gently.
Hold the mounting plate
against the wall and mark
the drillholes (pay attention
to where wiring runs in
wall). Drill the holes and
insert screw anchors.
13:51 Uhr
Seite 10
BLACK/
BLUE
BROWN
In order to be able to per-
form switching operations,
the connection to the
power supply must be
made by a power cord with
at least two conductors.
A hole can be punched in
the rubber stopper with a
screwdriver for this pur-
pose. When the wires have
been passed through, the
mounting plate can be
screwed on and aligned.
Connecting the power
supply lead
The supply lead consists of
a two-phase or three-
phase wire:
L = phase conductor
(usually black or brown)
N = neutral conductor
(usually blue)
PE = protective earth
conductor, if present
(green and yellow).
In case of doubt, identify
the individual conductors
by means of a voltage
tester; then disconnect the
power supply again.
The phase conductor (L)
and the neutral conductor
(N) go into their corre-
sponding terminals, to which
conductors of the same
color are already connect-
ed. Protect the protective
earth (PE) conductor with
insulating tape.
Note: Mixing up the termi-
nal connections can cause
a short-circuit later in the
unit or in your fuse box.
In that case, the individual
wires must be identified
again and reconnected.
A power switch for switch-
ing the unit on and off can
be installed in the supply
lead, of course.
9

Publicidad

Tabla de contenido
loading

Tabla de contenido