APPENDIX B1
Maintanace / Check and Inspections
CAUTION:
voltage and put the signal MAINTENANCE IN PROGRESS next to the lockable main switch in "Off" position.
Carrying out the tests and check program listed below will extend the life of the equipment and avoid possible breakdowns.
Please Note: it is of utmost importance the compliance with Regulation (UE) No 517/2014, regarding mandatory regular
leakage-check program, as described in Section 2 of this Operation and Maintenance Manual.
•
Check mechanical working of the compressor . Control the absence of metallic vibrations and not too high noises and
temperatures on the compressor head during running to verify its regular working.
•
Check the operation of the fan.
•
Check the electrical alarm systems and controls.
•
Check the filling of the tank (visual level). If the system is filled with a glycol-mix, refill only with the same mix. Only water
will reduce the concentration of glycol.
70040-120_01-_-(CCE_Op._Manual_EN-DE-IT-ES-FR-RU).docx
English
Before any maintenance intervention, not needing the machine running, disconnect the supply
Picture 17– Compressor placement for CCE 6101 – 6201 – 6301
Picture 18 – Compressor placement for CCE 6401 – 6501 - 6601
Picture 19 – Fan placement
19