Pfannenberg CCE Standart Serie Instrucciones De Operación Y Instalación página 14

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 73
CAUTION:
must be quick
Switch on the pump; the fluid level must always stay over the miminum level. After the water circuit has run for approx. 5
minutes, switch off the main switch and check again the visual level of the tank; refill the tank in case of need.
Switch off the main switch, than switch all circuit breakers to the "on" position and then the main switch back to "On"
position.
For 3 phase version fan should be checked for the correct rotation. (Please note that there is an arrow located at the side
part of the fan-shroud for direction indication). Reverse two phases R-S-T on the terminal board in case of incorrect
rotation.
NOTE: for units without fan please verify the correct rotation on the pump motor.
70040-120_01-_-(CCE_Op._Manual_EN-DE-IT-ES-FR-RU).docx
English
Picture 13 – Main switch ON
The pump must not flat running or in inverse direction; therefore the checking of the correct rotation
Picture 14 / 15 – tank top up
14

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cce 6101Cce 6201Cce 6301Cce 6401Cce 6501Cce 6601

Tabla de contenido