Positioning The Chiller; Connections - Pfannenberg CCE Standart Serie Instrucciones De Operación Y Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 73
English
Caution:
the chiller must be transported and moved without liquid/s in the tank/s
Picture 1 – Chiller lifting
Check after the final positioning of the Chiller the internal connections to avoid damage during operation.

5. Positioning the Chiller

Place the Chiller in an area shielded from any possible manufacturing residuals (shavings, dust, etc.) and well-ventilated, away
from heat sources and direct influence of sun light ; if possible, near the user system, in order to avoid load losses along the
hydraulic connection pipes. Use the adjustable feet (where installed) to level off the cooling unit.
Not intended use
: chiller can't be installed on mobile floor, or conveying vibrations, oscillating or inclined one.
The customer has to place a suitable room at disposal, as shown in the figure:
Picture 2 – Room minimum dimensions, x= 1.5 m, h=0.5 m
According to CEI EN 60204-1, for units which don't have the lockable main switch at a minimum distance of 0,6 m from the
basement of the unit, it's necessary to install that units in a position that allows to maintain that minimum distance.
CAUTION:
For standard unit the outdoor installation is absolutely forbidden, even if under a roof.
Only special designed outdoor units can be used in outdoor installation.
For regular maintenance or adjustment, the chiller shall be located between 0,3 m and 1,0 m above the servicing level.
PFANNENBERG chillers should be set on a concrete slab. The slab should extend a minimum of 30cm (12 inches) beyond the
perimeter of the Chiller to prevent damage from lawn maintenance equipment, etc. The Chiller, which should be level and
properly anchored, is provided with 4 antivibration dampers on the bottom of the unit, which allow the support and the fixing of
the Chiller and to dampen the vibrations and decrease the noise during the operation.

Connections

70040-120_01-_-(CCE_Op._Manual_EN-DE-IT-ES-FR-RU).docx
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cce 6101Cce 6201Cce 6301Cce 6401Cce 6501Cce 6601

Tabla de contenido