Operating Pressure - POLTI Vaporetto Leader Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 13
ENGLISH
Fig. 5 - Put the lock-on connector button on the tool or
extension tube to "open".
Fig. 6 - Connect to the handgrip connection on the
steam gun. Add a further extension tube if required.
Fig. 7 - Add the tool (eg large brush) by putting its con-
nector button to "open" and attaching. Lock on by pushing
connector button across to "closed" position.
Switch on the accessories on/off switch on the generator.
After a few minutes the generator is then ready for use.
Fig. 8 - Steam jet can be switched on and off by the
switch on the steam gum handle.
Always unplug the supply cable from the mains while
changing accessories.
Where your machine has the steam regulation feature,
you can regulate the amount of steam as necessary
according to application.

OPERATING PRESSURE

Carry on if control lamp comes on whilst
cleaning. This is quite normal indicating
that the system is maintaining its correct
operating pressure.
PROFESSIONAL IRONING STATION
(Optional extra)
With generator containing water and ready for use (accessory switch on
generator in "off" position).
Fig. 9 - Connect the system plug on the iron into the connection on the
generator for the central connector; Place iron soleplate down on the heat-
resistant stand.
Fig. 10 - For Steam Ironing place the thermostat ring on the highest "steam"
/ "cotton/linen" position. Wait until the control-light on top of the iron goes
out. The iron is then ready to use.
FIG. 5
FIG. 6
FIG. 7
FIG. 8

Publicidad

Tabla de contenido
loading

Tabla de contenido