Install The Chute Deflector; Install The Battery Pack - GreenWorks Pro SN60L02 Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
7.3
INSTALL THE UPPER HANDLE
17
1. Align the holes in the middle handle (15) and the upper
handle (14).
2. Put the bolts (17) through the holes.
3. Tighten the handle knobs (16) onto the bolts (17).
4. Do the same operation on the other side.
7.4
INSTALL THE CHUTE-ROTATION
BOX
23 24
19
1. Align the holes in the panel of the chute-rotation box (23)
and the switch box (24).
2. Put the chute-rotation box screws (18) through the holes.
3. Tighten the chute-rotation box screw nuts (19) with a
wrench (not included).
14
16
15
18
English
7.5
INSTALL THE CHUTE
DEFLECTOR
18
1. Align the grooves (26) of the discharge chute with the
slot (25) on the chute housing.
2. Push the discharge chute (7) into position.
3. Tighten the discharge chute screws (18) with a Phillips
head screw driver to lock the discharge chute.
7.6

INSTALL THE BATTERY PACK

If the battery pack or charger is damaged, replace the
battery pack or the charger.
Stop the machine and wait until the engine stops before
you install or remove the battery pack.
Read, know, and follow the instructions in the battery
and charger manual.
This machine has the dual-pack switch function that lets the
other battery pack continue to operate when the first one is
out of battery after 2-3 seconds. The machine can be
increased the double working time by the function.
1. Open the battery door (5).
2. Align the ribs on the battery pack (20) with the grooves in
the battery compartment.
3. Push the battery pack (20) into the battery compartment
until the battery pack (20) locks into place.
8
7
26
25
5
20
21
WARNING
NOTE

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sn60l522

Tabla de contenido