PRODUCT GUARANTEE / INSTALLATION NORMS
8 – SHOWER TRAY PLACEMENT
The unpacking of the tray would be carried out with special care not to hit it or
scratch it with the tools used to open the box.
Protection plastic and cardboard itself will be used to protect the tray during it
installation.
Place waterproof bands on the angles formed by walls and the tray to avoid leaks
between dish and wall.
In the phase of anchoring the shower tray, we recommend to apply on the mortar
base once dry or on the dish alongside bands or multiple spots of a kind of filler of
polyurethane. Never use adhesive cement for this purpose.
7