MHt HeAteR AsseMBlY INstRuctIONs
1. Place gaskets from Gasket kit (02885) on each side of the burner
box. Use the four mounting studs around each of the three-inch
holes for location.
2. Slide the tube flanges over the studs as was done in the prior step
with the gaskets. The tube ends extend through the flanges to
help with alignment.
3. Using the four long and four short nuts from the bolt kit (02876)
secure the tube set to the burner box. As shown in the diagram,
use the four long nuts in the center and the four short nuts on
the outside.
4. Slide the bulkhead and reflector assembly forward until it stops on
the long nuts. Using the (4) 5/16-18 X 1/2" long screws form the
(02876) bolt kit secure the bulkhead to the burner box.
Gas-Fired Low-Intensity Infrared Heater
USE CAUTION AS NOT TO OVERTIGHTEN
ASSEMBLY AS IT MAY CAUSE DAMAGE
TO PARTS OF ASSEMBLY
E11
Operating Instructions and Owner's Manual